A developer must provide for a controlled rate of release of storm water exiting the project not to exceed 0.20 cubic feet of water per second per acre. The amount of storm water exiting the project cannot exceed the amount calculated above, but may be further restricted by the capacity of existing storm drains or drainage facilities as determined by the city engineer. Restrictions to the controlled the rate of release will require that detention storage be provided.