Skip to main content
Loading…
This section is included in your selections.

1. Easements shall follow rear and side lot lines whenever practical and shall have a minimum total width of ten feet (10'), apportioned equally in abutting properties.

2. Where front-line easements are required, a minimum of ten feet (10') shall be allocated as a utility easement. Perimeter easements shall be not less than ten feet (10') in width, extending throughout the peripheral area of the development, if required by the city engineer.

3. All easements shall be designed so as to provide efficient installation of utilities or street planting. Special guying easements at corners may be required if any utilities are to be overhead. Public utility installations shall be so located as to permit multiple installations within the easements. The developer shall establish final utility grades prior to utility installations. (Ord. 2023-22 §1, renumbered, 2023; Ord. 2022-9 §1, amended, 2022; Ord. 2001-8, amended, 2001; Ord. 111 §1, amended, 1985; Prior code §12-107-7(H)(13). Formerly 17.32.210)