Skip to main content
Loading…
This section is included in your selections.

Any pipe trench or other trenching or excavation made in any slope of any excavation or filled site shall be backfilled and compacted to the level of the surrounding grade. (Ord. 111 §1, amended, 1985; Prior code §12-107-6(F)(8))