Skip to main content
Loading…
This section is included in your selections.

The user shall provide and operate, at its expense, monitoring equipment and facilities approved by the POTW Manager, sufficient to allow inspection, sampling, and flow measurement of the building sewer systems. The monitoring equipment and facilities shall be situated on the user’s premises or such other location as allowed by the POTW. There shall be ample room in or near such monitoring manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a proper operating condition at the expense of the user. Whether constructed on public or private property, the sampling and monitoring equipment and facilities shall be provided in accordance with the POTW’s requirements and all applicable local construction standards and specifications. Construction shall be completed within ninety (90) days following written notification to the user by the POTW.