Skip to main content
Loading…
This section is included in your selections.

The connection of the building sewer into the POTW sewer shall conform to the requirements of the building and plumbing code or other applicable rules and regulations of the City. All such connections shall be made gastight and watertight and verified by proper testing. Any deviation from the prescribed procedures and materials must be approved by an inspector before installation. No lateral shall connect to the POTW sewer in a manhole without the Director’s approval.