Skip to main content
Loading…
This section is included in your selections.

All conventional subdivisions shall be complete with water, sewer, and storm water utility systems installed before the subdivisions are accepted by the city. Subdivisions shall have completed secondary irrigation systems where access to the city’s system is reasonably available. The design and specifications for these required systems shall be subject to the approval of the city engineer. (Ord. 2018-18 §1 (Exh. A), amended, 2019; Ord. 121 §23(e), amended, 1985)